Skip to main content
Work with the NEU
Sunak slammed for continuing evasiveness over expectations he is to axe HS2 link to the north
HS2 contractors excavating an area below a newly replaced section of the Aylesbury to Princes Risborough branch line track which will allow the high speed rail to pass underneath, September 25, 2023

PRIME MINISTER Rishi Sunak has been condemned for his continuing evasiveness over scrapping the northern leg of the HS2 high-speed rail line.

Greater Manchester Mayor Andy Burnham accused Mr Sunak of poor leadership for allowing expectation to grow that he will axe the project due to costs.

Mr Burnham told Channel 4 News on Monday that doing so would be devastating for the region.

The 95th Anniversary Appeal
Support the Morning Star
You have reached the free limit.
Subscribe to continue reading.
Similar stories
Andy Burnham
Cost of living / 9 August 2026
9 August 2026

The real welfare dependency is at the top of our society, says ALAN SIMPSON

FRAUGHT PROCESS: A member of HS2 staff walks through the Chilterns tunnel of the new line
Features / 23 May 2026
23 May 2026

The HS2 debacle exposes what happens when public infrastructure is handed to private contractors – especially when set against China’s state-led high-speed rail success, says CARLOS MARTINEZ